Phase 2 โ Scope & Roadmap
Phase 1 delivers the core pour card workflow: BOQ โ Sales Order โ Pour Card โ M-Book โ RA Bill โ Sales Invoice, with full IS 456:2000 compliance, QC approval workflow, and ERPNext integration. Phase 2 adds the commercial, operational, and government-contract features required for larger enterprise clients.
Phase 1 โ What is delivered
โ BOQ โ Sales Order push (ERPNext)
โ Pour Card creation (5-step office wizard)
โ Multi-pour planning per element
โ RMC volume calculator + order
โ BBS drawing attachment
โ Site Pour Entry (tablet-first)
โ Site Post-Pour & curing record
โ BOQ Mapping & split
โ M-Book entry (CPWD format)
โ RA Bill with M-Book selection
โ Sales Invoice โ ERPNext
โ IS 1199 slump test (batching + discharge)
โ IS 516 cube test reference
โ IS 456 Cl.5.6 exposure condition
โ IS 456 Cl.10.3 mix design reference
โ Cube test result entry (7-day + 28-day)
โ IS 456 Cl.16.1 acceptance check
โ QC Inspector approval workflow
โ NCR raising + closure workflow
โ PM Override + Hold decisions
โ Deshuttering schedule (IS 456 Table 11)
โ Honeycombing severity + NCR trigger
โ Sales Order linkage throughout
โ Partial billing per pour sequence
โ Retention (5%) tracking
โ Mobilisation advance recovery
โ GST Works Contract (12% / 18%)
โ PM approval before invoice
โ Billing history per BOQ item
โ CPWD M-Book: Measured by / Checked by
โ Cumulative BOQ execution tracking
โ M-Book on hold โ NCR linked
โ Left sidebar navigation (ERPNext style)
Phase 2 โ Scope by priority
Grouped by how frequently clients ask about these in demos and during implementation scoping.
Variation Order (VO) / Extra Item Management
High effortEvery real construction contract has deviations from the original BOQ โ additional items, rate changes, omissions. A VO module allows raising, approving, and billing extra items separately from the original BOQ scope. Without this, contractors cannot bill for any work outside the original schedule.
Drawing Register & Revision Control
Medium effortCurrently pour cards reference a drawing number as a text field. A proper drawing register tracks every drawing issued to site, its revision history, who received it, and ensures site engineers always pour against the current revision โ not a superseded drawing.
Cube Sample Register (Lab Tracking)
Low effortCurrently cube results are entered directly by QA. A sample register adds chain of custody โ which cubes were dispatched to which lab, lab's own test report reference number, and reconciliation of lab results vs. in-house records. Required for ISO 9001 QA audits and government project inspections.
Progress Dashboard โ Physical vs. Billing Progress
Medium effortProject managers and clients want to see overall project health โ not just individual pour cards. An S-curve or progress dashboard shows: planned vs. actual physical progress, billing progress vs. physical progress, and early warnings when billing lags or leads physical work.
Subcontractor Back-to-Back Billing
High effortMain contractors sub-contract portions of work (concrete, formwork, reinforcement). The main contractor needs to process RA Bills from subcontractors, reconcile with their own client billing, and track back-to-back margins. Currently not in scope.
Site Instruction (SI) / RFI Register
Medium effortWhen the site encounters something not covered in drawings โ wrong dimension, clash, unclear specification โ the site engineer raises an RFI (Request for Information) to the architect or client. Responses are tracked as Site Instructions. Without this log, verbal instructions get lost and become billing disputes.
Plant & Equipment Log per Pour
Low effortFor large sites with owned or hired plant (tower cranes, boom pumps, transit mixers, batching plants), linking equipment utilisation to pour cards enables cost allocation, hiring cost tracking, and equipment productivity analysis.
Contract Milestone Payment Schedule
Low effortSome contracts (particularly lump-sum EPC contracts) use milestone-based payments rather than measurement-based RA Bills. A milestone payment module tracks: milestone definition, % of contract value, completion criteria, and payment trigger.
Phase 2 Summary
| Feature | Priority | Effort | Who asks | Phase 1 gap note |
|---|---|---|---|---|
| Variation Order management | P1 โ Demo | High | All clients | Extra items not billable in Phase 1 |
| Drawing register & revision control | P1 โ Demo | Medium | PM / QA clients | Drawing ref is free text only |
| Cube sample register (lab tracking) | P2 โ Scoping | Low | ISO 9001 / Govt clients | No chain of custody for cubes |
| Progress dashboard (S-curve) | P2 โ Scoping | Medium | Project Directors, Finance | No planned vs. actual view |
| Subcontractor back-to-back billing | P2 โ Scoping | High | Main contractors with subs | No sub billing module |
| Site Instruction / RFI register | P3 โ Enterprise | Medium | Govt / CPWD / large EPC | No SI/RFI log |
| Plant & equipment log per pour | P3 โ Enterprise | Low | Large sites with owned plant | No equipment cost allocation |
| Milestone payment schedule | P3 โ Enterprise | Low | Lump-sum EPC clients | Only measurement billing in Phase 1 |