NCR-045: Honeycombing east face beam 0.08m² — Grout repair required.
📷 Upload photo of completed repair
V
Velantra ERP
NCR & Quality
🖥 Office Mode
Pending QC approvals
3
Pre-pour awaiting sign-off
Open NCRs
2
1 major · 1 minor
Cube results pending
2
28-day due dates upcoming
M-Books on hold
1
NCR-044 — billing blocked
Pre-Pour QC Approval Queue
3 pending
QC Inspector reviews the site engineer's pre-pour checklist before concrete is placed. Approval triggers the next workflow step (PM sign-off or direct pour clearance depending on contract).
Tata Networking · Pour 3 of 3 · Site Engr: R. Kumar
✓
Site Engr.
→
2
QC Inspector ← Now
→
3
PM
→
4
Client Rep.
Waiting 45m
Checklist summary: 10/10 OK · 0 NOK · All clear · BBS verified ✓ · Previous pour cube results: Pass
✅
—
—
NCR Register — Tata Networking
NCR-044MajorOpenPC-019 · Column A2 · IS 456 Cl.16.1
Cube 7-day result: 14.2 N/mm² vs target ≥ 16.25. 28-day results due 17 Apr 2026.
Raised: 25 Mar 2026 · By: S. Natarajan (QC) · Responsible: RMC Supplier
M-Book MB-2026-041 on hold — billing for PC-019 blocked pending 28-day cube confirmation.
Decision log
25 Mar — Warning issued. Awaiting 28-day results. PM notified.
26 Mar — PM acknowledged. Monitoring.
NCR-045MinorRectification in progressPC-024 · Slab B3-SL-01 · IS 456 Cl.13.5
Honeycombing on east face beam — approx. 0.08m², 20mm depth. Grout repair in progress.
Raised: 28 Mar 2026 · By: R. Kumar (Site Engr.) · Responsible: Site sub-contractor
Site instructed to grout and seal. Photo proof required before QA sign-off and M-Book release.
NCR-038ClosedMinorPC-011 · Column A1 · IS 456 Cl.26.4 — Cover inadequate. Rectified 14 Feb. QA signed off.
IS 456 : 2000 — QC Decision Reference
Cube acceptance Cl.16.1
Mean of 3 cubes ≥ fck + 4 N/mm²
Each individual ≥ fck − 4 N/mm² M25: Mean ≥ 29 · Individual ≥ 21 M30: Mean ≥ 34 · Individual ≥ 26 Both must fail to reject.
Honeycombing Cl.13.5
Minor (surface): grout & seal acceptable
Major (deep): structural engineer assessment
Core test Cl.17 if structural concern Do not grout before engineer reviews major cases.
Decision options
Warning Flow continues, note attached PM override Billing proceeds, PM signs Hold M-Book Billing blocked, Cl.17 test Rectification Proof required, then release
Clause
Topic
Key requirement
QC action
Cl.13.1
RMC dispatch
Placement within 90 min of mixing
Check truck dispatch time at site
Cl.13.2
Segregation
Concrete not dropped more than 1.5m
Observe during pour
Cl.13.3
Vibration
500mm spacing, slow withdrawal
Verify needle vibrators during pour
Cl.15.2
Cube frequency
Min 1 set (4 cubes) per 50m³
Count cubes before submittal
Cl.15.2
Cube frequency
Min 1 set (4 cubes) per 50m³
Count cubes before submittal · Method per IS 516
Cl.16.1
Cube acceptance
Mean ≥ fck+4 · Individual ≥ fck−4 N/mm²
Enter results in M-Book cube tab · Test per IS 516
Cl.5.6
Durability / Exposure
Exposure condition determines min cover and w/c ratio
Confirm exposure class on pour card header
Cl.10.3
Mix design
Mix design must be approved before pour
Mix Design Ref on pour card header — verify with QA
Cl.26.4
Cover to rebar
Per drawing — min 40mm columns (Moderate exposure)