Site Mode β€” Post-Pour & Curing

Essential facts only Β· Office reviews compliance

πŸ— Site Mode

Pour reference

Post-Pour Stage B
PC-2026-03-027
Column Β· B3–B5
M25
30 Mar 2026

Immediate post-pour facts

No segregation during pour
Surface acceptable / as specified
Any defects noted at pour stage

Curing record IS 456 Cl.13.5

IS 456 Min. Curing Dates (reference)
OPC (7 days)
07 Apr 2026
PPC / SRPC (10 days)
10 Apr 2026
Slabs ≀4.5m (14 days)
14 Apr 2026
Slabs >4.5m (21 days)
21 Apr 2026
βœ“ Write curing start and end date physically on the member (IS 456 Cl.13.5). Office will verify minimum duration and set the deshuttering schedule.

Post-deshuttering inspection

Fill this section only after shuttering is removed. IS 456 Table 11 minimum times: columns 24–48h, slabs ≀4.5m span 14 days, beams/slabs >4.5m 21 days.

Site photos

Capture both faces after deshuttering, honeycombing areas, curing materials in place. 3 photos attached.

Dates & closure reference

ReferenceDateNote
Planned curing end (OPC 7-day)07 Apr 2026System-calculated, IS 456
Deshuttering earliest β€” Column31 Mar 2026IS 456 Table 11: 24–48h vertical faces
Site closure actionMark "facts captured"Office QA reviews next